A cabinetmaker sends a question about a niche. The designer opens the drawing and the dimensions are right. The photo from the site shows something else.
It turns out the contractor is working from a file he received two weeks ago. The new version went to the client, but it never reached the person doing the work.
The right drawing existed. The way materials were passed along failed.
File storage for a design project has to do three things: help people find a material, tell the current version from an old one, and make clear what the file can be used for. That takes a clear structure, consistent names and a rule for updating materials.
You can start with one active project, without renaming the studio's whole archive.
Separate working materials from what you hand to others
A project collects source files, interim options, images for discussion and issued sets. Each is needed for a different action.
If everything sits in one folder, people have to guess a file's purpose from its date and extension.
It helps to tell these groups apart:
| Group | What it holds |
|---|---|
| Source data | Measurements, photos, plans, client answers |
| Working materials | Editable files and interim results |
| Under review | Specific options sent out for discussion |
| Issued sets | Materials released for a particular purpose |
| Version archive | Replaced options and earlier issues |
You don't have to create exactly five folders. What counts is that a working sketch can't be mistaken for a drawing for manufacturing.
Treat the client's confirmation just as precisely. They may accept the look of a wardrobe while its construction still needs work. A label like "Approved" with no explanation doesn't always answer whether production can start.
An example folder structure for a design project
For a small residential project you can start with this:
- 01 Source data
- 02 Layout
- 03 Concept and visualizations
- 04 Drawings
- 05 Procurement
- 06 Construction and photo records
- 07 Issued sets
Inside the sections, add rooms or types of material when you need them.
In the concept section, for instance, it is handy to separate the living room, the bedroom and the kitchen. In drawings, it is sometimes easier to keep one set than to spread interrelated sheets across rooms.
Don't build nesting in advance "just in case." If you have to open six folders to reach one image, the structure is getting in the way.
Section names should match how the team looks for things. Ask a colleague: "Where would you look for the current kitchen elevation?" If the answer differs from yours, the rule needs an explanation or a simpler form.
How to name files
A good name answers a few questions: which project, which material, which room or section and which version.
For example:
Apartment_Park_Kitchen_Elevations_v03_2026-10-27.pdf
If a file is always opened inside a specific project, the name can be shorter:
Kitchen_Elevations_v03_2026-10-27.pdf
This is an example of a working rule, not a standard. Apply whatever order you choose consistently.
| Poor name | Clearer option |
|---|---|
final.pdf | Layout_v04.pdf |
kitchen new 2.pdf | Kitchen_Elevations_v03.pdf |
IMG_4821.jpg | Bedroom_Headboard_2026-10-27.jpg |
selection corrected.xlsx | Procurement_LivingRoom_v02.xlsx |
"Final" and "latest" go stale fast. A version number stays useful even after the next change.
Don't load the name with the whole history of the work. The reason for a revision is better described in a message or a change note.
Version and date are different things
A version tells successive states of a material apart. A date shows when it was prepared or issued.
They complement each other.
For example, two editions can be prepared in a single day. And the file created last may turn out to be a draft experiment nobody plans to use.
So sorting by date doesn't replace marking which material is current.
When the version changes, the new edition should get a new designation. Don't send files with different content under the same name: people will find it hard to tell which option they opened.
When you update, explain what changed
A message like "Updated the drawings" makes the recipient look for the differences on their own.
Give a short summary:
Kitchen elevations updated, version 03. The width of the fridge section and the position of two outlets have changed. We no longer use the previous version 02. Please confirm you received it before continuing work on this area.
If several sheets change, list them. If you issue a whole set, state its date and contents.
It matters not just to upload the file but to tell the right person about the update. Someone on site isn't obliged to keep checking every project folder.
For a critical change, ask for confirmation that the new information was received and understood.
Don't delete history in the name of tidiness
An old version is sometimes needed to recover the reason for a decision or to see what changed.
But storing it shouldn't compete with the current file.
Move replaced materials to an archive or mark them clearly as earlier versions. In the working section, leave a clear path to the current issue.
Don't delete a material that has a saved approval attached without understanding what it does to the project history. Otherwise the record of the decision stays, and the thing that was approved can no longer be viewed.
If the client goes back to an earlier option, that is a new action. Record which edition was accepted again and which related materials now need updating.
The source file and the PDF serve different tasks
An editable file lets you continue development. A PDF is handy for viewing and for passing on a specific issue.
Don't treat them as interchangeable.
For your team, define where the working source is kept and who changes it. For the recipient, say which material was handed over and for what purpose.
Export needs checking too. Before sending, open the PDF and look at:
- whether all the needed sheets are included;
- whether dimensions and labels are readable;
- whether any elements are cut off;
- whether the scale is correct where it matters;
- whether the content matches the stated version.
A clear name doesn't make up for a mistake inside the file.
What to hand to the client and to the contractor
A client may need the concept, the options and explanations of the choice. A contractor needs the specific information for their work.
Sending the whole archive to both is usually inconvenient. It is harder to find what's needed among dozens of files, and working options can raise unnecessary questions.
Before handing something over, decide:
- Who receives the materials?
- What action are they for?
- Which files are required?
- Are there open questions or constraints?
If a contractor gets only part of the set, say so directly. Don't create the impression that a few sheets describe the whole project.
The terms for handing over editable source files are worth defining in advance, in the scope of services.
Example: updating the kitchen after the appliances are chosen
Take a hypothetical case. The client replaced the refrigerator, and the designer adjusted the kitchen.
It isn't enough to fix one file and leave the rest unchecked. The change can affect the layout, the furniture elevation, the dimensions and a line in the procurement list.
The order of work:
- Work out which materials depend on the new model.
- Update the affected files.
- Check that the data in them matches.
- Issue a new edition with an explanation of the changes.
- Tell the people who use the earlier materials.
- Take the old versions out of active work.
The hard part isn't renaming. You have to trace where the change spread.
How to store project materials in Roomix
In Roomix, files and documents live inside the project next to the chat, the stages and the approvals. You can organize materials in folders and discuss them in the context of work on the property.
Use this space as the place where participants find the current materials. When you add a new edition, keep a clear name and explain the changes in the chat.
A client can leave comments on images and approve materials. When they approve, the name, the date and the time are saved. That's why it is important to send for review exactly the option named in the message.
For a contractor you can use a separate realization and share the materials they need with the right access.
Storing everything in one service doesn't replace working rules: you still have to explain which file to use and what changed after an update. More on handling comments after an update is in client revisions without endless redos.
Open Roomix and gather your project materials.
How to get order without moving the whole archive
Start with the project you're working on now:
- identify the current materials;
- separate them from drafts;
- agree on names for the next versions;
- check which files the people doing the work use;
- add new issues under one rule.
Separately, decide how to back up important sources and issued sets. Organizing folders helps you find materials, but it isn't a backup by itself.
Checking whether the system is convenient is easy: ask a colleague to find the current drawing and explain what work it was issued for. If they can answer without calling the author, the order is already paying off.