In the morning the designer sets out to finish a floor plan. Then a cabinetmaker has a question, the client on another project sends comments on a concept, and a foreman asks where exactly a light fixture goes.
By evening thirty messages have been answered. The floor plan has barely moved.
With several projects, the load doesn't come only from the volume of design work. Time goes into rebuilding context: which option was chosen, what we are waiting for, who has to answer and whether the work can continue.
To run several design projects at once, you need an overall picture of commitments, specific tasks for each property and a separate record of the decisions that depend on a client or a contractor. Plan not only the preparation of materials, but also approvals, site visits, checks and the handling of changes.
Here is a working routine that you can use on your own or in a small studio.
First define the nearest result for each project
A list of properties shows how many projects you have. It doesn't say what has to be done this week.
Open each active project and answer four questions:
- What is the nearest result you promised?
- By what date is it needed?
- What is in the way of preparing it?
- Who has to act now?
That gives you a short summary.
| Project | Nearest result | What is needed now | Whose next step |
|---|---|---|---|
| Apartment by the park | The chosen layout | Collect the family's shared answer on two options | Client |
| Country house | The updated kitchen concept | Make the confirmed changes | Designer |
| Riverside apartment | A prepared lighting order | Check article numbers and completeness | Procurement specialist |
This is a hypothetical example. Even so, you can see that the same label "in progress" hides three different situations.
You don't have to reread a property's whole history every day. But the nearest result and the reason for waiting should be clear without searching through messages.
Don't turn a stage into one huge task
"Make the concept" is the name of a job that is hard to fit into a specific day. It includes selection, preparing materials, checking the budget and discussion.
Break it into actions with a checkable result:
- confirm the list of furniture that stays;
- prepare a selection for the living room;
- check the cost of the key items;
- put together the mood board;
- send the material to the client with questions.
Break it down to the level where you can estimate the work and start it without further thought. You don't need to log every mouse click.
A good task wording answers one question: what should exist once it's done?
"Sort out the sofa" is unclear. "Get the dimensions and the manufacturing time of the chosen sofa from the supplier" can already be assigned to a colleague or to yourself.
Separate your own work from waiting for someone else's answer
If a floor plan was sent on time but the client hasn't looked at it yet, that isn't the same as a floor plan that isn't prepared.
For planning, it helps to tell these apart:
- we can work on it ourselves;
- a client decision is needed;
- we are waiting for information from an outside participant;
- the result is ready for review.
These are working categories, not required status names in a program.
Waiting needs a next action too. For example:
Waiting for the appliance dimensions from the client until Thursday. If they don't come, we confirm a date and revisit the kitchen release date.
Without this, "waiting" can stay an explanation for weeks that nobody checks.
When you ask for an answer, name the dependency:
To finish the kitchen layout, we need the models of the refrigerator and the oven. Could you send them by Thursday?
It is easier for a client to judge urgency when it is clear what their decision affects.
How to set priorities across properties
The latest message doesn't necessarily contain the most important task. The loudness of a discussion is also a poor signal of priority.
First look at the consequences of a delay.
Does the work block other people?
Clarifying a dimension may take a few minutes, but without it the cabinetmaker can't continue production.
Will the decision soon be expensive to change?
A question before installation and the same question after installation need different attention.
Is there a confirmed commitment?
A promised send of materials should count before a task with no agreed date.
Is the source data sufficient?
Don't set aside half a day for work that can't be finished without the supplier's answer.
From these questions comes a practical order: first remove the critical blockers, then meet the nearest commitments, and after that move the rest of the planned results.
Not every request to "look urgently" is automatically critical. Find out which action is actually stopped and by when an answer is needed.
Plan the week by results and the day by work blocks
First place what is already tied to a time: site visits, meetings and promised sends.
Then set aside time for preparing materials. Leave room between them for checking, messages and unplanned questions.
An example of a hypothetical weekly plan:
| Day | Main work | Additional actions |
|---|---|---|
| Monday | Update the kitchen concept | Check replies on another property's layout |
| Tuesday | Prepare drawings | Get supplier offers |
| Wednesday | Site visit | Record comments and assign actions |
| Thursday | Check and issue materials | Send questions for approval |
| Friday | Process replies | Update dates and plan the next week |
A plan like this doesn't mean a whole day belongs to just one property. It helps protect the time when the main work actually moves forward.
If every day is already packed tight, a new task doesn't fit into the schedule just because it appeared in a chat. You have to choose: move other work, change the scope, bring in a colleague or agree on a new date.
Leave a short working note when you switch
Often time is lost not on the switch itself, but on coming back.
Before you close a project, write down:
- what is already done;
- where you stopped;
- what to open or check next.
For example:
The concept is assembled. Left to do: check the armchair dimensions and replace the light fixture with the confirmed model. Then it can go to the client.
The next day, a note like this is more useful than reviewing the whole correspondence again.
If a task is handed to a colleague, add the current materials and the expected result. A colleague shouldn't have to guess which version is needed and which decision is already made.
Don't give one situation several independent histories
A discrepancy is found on site. The foreman wrote in the chat, the designer created a task, and the client sent their own comment somewhere else.
If these records exist separately, it is easy to close the task and forget that the client's question isn't solved yet.
Keep the original situation and link the actions to it. For example:
The depth of the wardrobe niche needs to be confirmed.
Inside it there can be the contractor's measurement, the designer's check and a request to the cabinetmaker. But the people involved need to see that it all belongs to one question.
The same rule applies to procurement: a change of model should show up in the working item, not stay only as a message saying "we picked another one." For more on that, see FF&E procurement without confusion.
How to tell the load is already too high
The number of projects says little by itself. A small property at an active stage can take more attention than a large project waiting for approval.
Watch for repeating signs:
- promised materials are regularly postponed;
- open questions stay without an owner;
- new comments get recorded but not handled;
- colleagues wait for review longer than they spend on the work;
- the same context has to be rebuilt several times;
- only the evening after the messages is left for design.
In that case, first find out where the work piles up.
If everything waits for the studio owner's review, an extra person won't necessarily speed things up. Perhaps you need to define which decisions a colleague makes alone and which really need review.
If delays come from the source data, improve the preparation for each stage instead of simply speeding up design.
How to organize several projects in Roomix
In Roomix, each property can be run together with its stages, tasks, correspondence, files and approvals.
Use stages for big results and tasks for individual actions with owners and deadlines. Project tasks also appear in the studio's shared task list: it is one piece of work that can be managed from different places, without making copies.
In the project overview, it is handy to check active stages, nearest deadlines, overdue items and open tasks. The studio overview helps compare the state of several properties.
Materials and client decisions stay inside the project. Comments about the site can be recorded in Author supervision and, if needed, linked to the relevant realization.
Start simple: for each active property, define the nearest result and create only the tasks that truly need action right now. You don't have to move your whole archive into the system to put the current week in order.
Open Roomix and organize your work across projects.
What to check at the end of the week
Open the list of active projects and go through five points:
- What did you promise and what was actually handed over?
- Which decisions haven't been received yet?
- Where did the dates or the source data change?
- Which tasks need checking?
- What is the nearest result for each property?
After a check like this, the next week starts from chosen work. The morning messages will still arrive, but they no longer decide the whole day by default.