"So what is actually going on with our project right now?"
In one week the designer checked the drawings, received supplier offers, processed comments and visited the site. The client saw a few messages and some photos. No overall picture formed.
That isn't necessarily distrust of the work. The person may just not see how the separate actions connect.
An interior designer's report is a short summary of the state of the project over a period, or after a stage. It shows what has been done, which questions are open, where the client needs to decide and what is planned next.
Its job is to help the work continue. That doesn't always take a big document: sometimes a structured message with links to the materials is enough.
When it is worth sending a report
The format depends on the situation.
| Occasion | What to show |
|---|---|
| The working week is over | What changed, what is open, what is planned |
| A stage is ready | Which materials are handed over and what decision is needed |
| A site visit happened | What you looked at, which issues you found, who acts next |
| A delay came up | The cause, the consequences and the next step |
| The project is ending | What was handed over and which questions remain |
You don't have to use every format at once. For an active site, a weekly summary plus separate messages about important events may work.
Discuss the frequency at the start. If nothing significant happened, don't pad the report with generic phrases to fill space. But say what you are waiting for and when you will check again.
Show results, not just that you were busy
"Worked on the kitchen," "talked to suppliers," "worked on the drawings" describe activity. It is hard for the client to see what it gave the project.
Compare the wording:
| Generic phrase | A more useful description |
|---|---|
| Worked on the layout | Prepared a second option: added hallway storage and kept the workspace |
| Clarified the furniture | Got the wardrobe dimensions; the chosen fittings fit the niche |
| Discussed lighting | The supplier confirmed three pendants are available in the right finish |
| Visited the site | Checked the outlet positions by the headboard; one dimension needs clarifying |
Don't turn the report into a detailed log of every action. Pick the results that change the state of the project or explain the next step.
A working report structure: five blocks
1. What was done
List a few specific results. If you mention a material, say where to open it.
For example:
The living room concept is updated: the sofa is replaced and closed storage is added. Version 03 is in the project materials.
Don't call a result final if it is still going through internal review.
2. What is in progress
Show the next actions without promises that depend on unknown data.
We're preparing the kitchen elevations. To finish them, we need the specifications of the chosen oven.
That way the client understands not only the name of the stage but the condition for moving it forward.
3. What the client needs to do
Set decisions apart. Among completed actions they are easy to miss.
Name what is being chosen, the material to look at and the date you'd like the answer by.
We need you to choose the sofa upholstery from two samples. The comparison is in the project. Could you look by Thursday? After your answer, we'll request the supplier's final offer.
If the decision needs a meeting or a look at a sample in person, suggest it directly.
4. Open questions and risks
Name the circumstances that could affect the work.
The supplier hasn't yet confirmed the manufacturing time for the table. The request is sent, and we expect an answer on Tuesday. Until it is confirmed, we don't treat the delivery date as final.
Don't write "no delays" if you haven't received the information yet. The absence of a confirmed problem doesn't always mean the absence of a risk.
5. What comes next
End the summary with the near-term plan.
After the upholstery is chosen, we'll update the procurement list and check the invoice. On the next visit we'll return to checking the wardrobe comments.
The plan should match the real state of things. If the result depends on the client's answer, keep that dependency in the wording.
An example weekly report
Below is a hypothetical example for an apartment at the procurement and construction stage.
This week on the apartment by the park
Done
Updated the living room selection: replaced the sofa and the coffee table. Received an offer for the kitchen lights. After the visit, added photos and a note about how the wardrobe door opens.
In progress
Checking the invoice for the lights. The contractor is working out how to fix the door.
Your decision needed
Choose the sofa upholstery from the two options. The materials are in the project. Could you look by Thursday?
Open question
The manufacturing time for the table is not confirmed yet. On Tuesday we'll check it with the supplier again.
Next
After the fabric is chosen, we'll update the procurement list and request the final invoice for the sofa. We'll check the wardrobe fix separately once the contractor says it is ready.
This message doesn't retell the whole correspondence. But it makes clear what was done, what is left and where the client influences what happens next.
Which photos to include after a visit
Dozens of shots with no captions make the client work out what's going on by themselves.
Pick the images that back up the report's conclusions:
- an overall view of the area;
- the detail in question;
- the change compared with the previous state;
- the result of a fix, if you've checked it.
Add a short explanation to every important shot:
Bedroom: the wardrobe is installed and the fittings are checked. The question about how the right door opens remains open.
A photo shows a state, but it doesn't replace a check. For example, you can't confirm from a general view of the furniture that all the mechanisms work.
Don't mark something "fixed" if you've only received a message from the contractor. It is more accurate to write: "The contractor reported it done, and the result still has to be checked."
How to report a delay
A report loses its value if only good news is visible in it.
If a date changes, explain:
- What is delayed.
- What cause has been established.
- Which work it affects.
- What is being done.
- When the next information will come.
Example:
The release of the kitchen elevations is postponed: we haven't yet received the specifications of the new appliances. This affects the dimensions and the fittings of some cabinets. Today we sent a list of the data we need. Once we have it, we'll confirm the release date.
Don't promise to keep the old date before you've assessed the remaining work. But don't leave it to the client to work out the consequences of the delay either.
When you need a PDF and when a message is enough
A message in the project suits a regular short summary. It is easy to reply to and to jump from to the right material.
A PDF report helps when you need to collect the results in a separate document: after a stage or a visit, or to keep the state of the project on a certain date.
The two formats can complement each other. You can attach a short message with the conclusions and actions to the document.
A report doesn't replace a separate client decision. If you need to approve a concept or choose a material, mark that as its own action. "Report sent" doesn't mean all the decisions listed in it have been made. For how a PDF is built and what it should contain, see what to include in a project PDF report.
How to prepare a report in Roomix
In Roomix, materials, correspondence and approvals are kept inside the project. After a visit you can record comments in Author supervision with photos and turn the needed actions into tasks.
So when you prepare a summary, you can lean on the project records: check which materials were sent, which decisions were received and which questions are still open.
For a separate document there are PDF project reports. Export depends on the plan; PDF reports are available on Pro.
Before handing it over, check the document's contents and whether the data is current. If a material changed or a new decision appeared after the export, a PDF you downloaded earlier won't update itself.
Open Roomix and pull the project's work together.
A template you can use every week
Project:
Period:
Done:
Specific results and materials.
In progress:
Next actions and the conditions for finishing them.
Client decision needed:
What to look at, what to choose and by what date.
Open questions:
What is unknown, who is clarifying and when we'll return to checking.
Next step:
What we plan after the current decisions.
Before sending, remove everything that doesn't help explain the state of the project. Check that the materials you mention are available to the client, and that dates and wording don't contradict your working agreements.
A good summary lets the reader quickly answer three questions: what changed, what is needed from me now and what happens next.